12 weeks and we are putting the finishing touches on the addition!
That’s Paul and Amy about 1/2 way through tiling the shower.
I started the painting almost two weeks ago and Amy is finally putting the finishing touches on the door trim.
We have done some tiling before but never Granite and look at that fancy sink and faucet!
This is that empty space between the closet and the shower! We made good use of it by installing some shelving that Amy will put all kinds of cute things I am sure.
If she ever fills her closets she will be able to open a store of her own! There is a full walk in closet next to the bathroom with double rods on one side with two sets of 24″ shelves for foldables and shoes and on the other side is a full length hanging rod with shelves above and we found a nice cubby area to put those things you never need but can’t throw out! And there is a full size linen closet in the bathroom along with the original 1/2 wall closet that was already in the bedroom! Geeze…..
And we do custom work – nothing but the best for our girls!
And that is before she has had a chance to get out and shop!
We have not done much to the rest of the house during this construction but we did manage to give Stephanie’s familyroom a facelift!
And now for the outside!